daily log

Framers have set 12 more panels over the last two days. In the kitchen, garage and mech. room areas. Everything is falling on the grid lines and fitting together very well. The hardest part is finding the panels needed and digging them out of the bottom of the stacks. Also Smartlam did not cut the 1/4” relief cut at the bottom of the panels. So cutting that on site is taking a lot longer.