Daily log

Framers spent Monday the 7th installing steel interior wall hold downs. They set 6 panels today. Finishing the back to back bathroom areas and headed for the master bath and bedroom. Some of the joints between panels that were set today are pretty gapped. Some up to 1/2”. They should be fillable upon finish. The fabricator has finished all of the steel except for the garage tension rods. I delivered the steel to the site this morning.